viewed: 日期:2016/10/9 16:26:35
Recently, another piece of news came from Boqi Electricity Company. Depending our advanced designing ability and high quality service, we won Jiangsu Sheyanggang #5 Unit (660MW) Ultra Low Emission Desulfurization Transformation Project.
This project is EPC general contracting mode. It includes all the work of transformation, installation and construction of the desulfurization system. Flue gas pollution emission is designed by super clean emission standards. After the transformation, the desulfurization efficiency is not lower than 98.7%, the outlet SO2 concentration is lower than 34mg/Nm3 and the outlet dust concentration is lower than 20 mg/Nm3 . The unit is planned to put into operation in the end of this year.